Optimization of the Movement of Transfer Points on the Horizons in the Deep Iron Ore Open Pit

Optimization of the Movement of Transfer Points on the Horizons in the Deep Iron Ore Open Pit PDF Full text 

I.Yu. Kobelyatskiy, V.V. Panchenko, L.M. Solodovnik

National Mining University

UDC 622.27.012.3.001.63

Metall. Min. Ind.2011, Vol. 3, No. 5, pp. 235-240

Abstract

The optimization problem statement of the movement dynamics of all the ore transfer points of the open pit in spatial, temporal and technological relationships that meet the general technical and economic requirements and conditions was formulated for the first time. The technique of solving this problem, which is based on decision theory, what allows to take into account informalizable and low formalizable mine engineering factors. As a consequence, the efficiency of the solutions obtained increases compared to traditional practice and mathematical methods.

Keywords: IRON ORE OPEN PITS, MINING TRANSPORT OPERATIONS, FLOWCHARTS, MOVEMENT OF TRANSFER POINTS, MOVEMENT OPTIMIZATION

Presentation

Cover

Contacts

"Metaljournal" publishing
[email protected]
Dnipro

Project manager - Volodymyr Grynov