The Optimization of Copper Utilization during Decoppering of Technical Lead

The Optimization of Copper Utilization during Decoppering of Technical Lead PDF Full text 

Ahmet Haxhiaj1, Islam Fejza1, Murtsel Rama1, Bajram Haxhiaj2

1Faculty of Mining and Metallurgy, Mitrovice, University of Prishtina 
2 Faculty of Achitecture, Prishtine, University of Prishtina.

UDC 669.4+669.3

Metall. Min. Ind.2012, Vol. 4, No. 1, pp. 45-50

Abstract

In order to have increased utilization of copper during the decoppering process of technical lead in lead refinery in Trepca two samples have been analyzed with the same chemical composition. Furthermore, identical parameters have been used for both samples which are: the quantity of technical lead, the process temperature, the quantity of brimstone loaded, the mixing time and the time of removal of schlicker, and the dismantle of rings formed in the walls of caldron for refinery. After the removal of brimstone schlicker and chemical analyses one calculates the balance of melting phases and decoppering and the scale of copper utilization. The majority of copper is removed from technical lead with the oxide schlicker, one part with the liquation and remaining part by decoppering with brimstone. The paper reflects on increasing utilization of copper in the decoppering of technical lead which is achieved with effective engagement of human factor.

Keywords: SAMPLE, LOADING, DECOPPERING, SCHLICKER, LIQUATION